Hybrid programs blend both competency- and time-based strategies,
using a minimum and maximum range of hours for each major job
function and the successful demonstration of identified competencies.
using a minimum and maximum range of hours for each major job
function and the successful demonstration of identified competencies.
Plumber
USDOL
National (OA)
Documents
View Original Document
Individual state requirements may vary. Please contact your local apprenticeship office to ensure this version is suitable to your state’s requirements.
Work Process Content
On the Job Training
Anonymous
18
Skills
8K
OJT hours
Hand Tools
1
400
Hand Tools
1
400
- Proper and safe use of basic hand tools including but not limited to pipe wrenches, screw drivers, rulers, levels, saws, pump pliers, hammers, plumb bob, taps, dies, etc.
Materials
1
450
Materials
1
450
- Identification and use of properly rated pipe fittings, and pipe materials. Identify galvanized, black and copper. be able to identify pipe schedules and know the reason and application of the differences.
Power Tool Field Use and Care
3
200
Power Tool Field Use and Care
3
200
- OSHA Safety Training for all power tools of the plumbing trade.
- Preparation and care of threaders, welders, generators and electric portable tools.
- Proper field care and inspection procedures for electric cords and tools.
Pipe Installation
2
3.1K
Pipe Installation
2
3.1K
- Installation procedures and practices for waste pipe, sewage, vents and leader pipe.
- Proper techniques for copper, CPVC, PVC, black pipe, galvanized pipe, fittings and joints
Fixture Skills
2
1.1K
Fixture Skills
2
1.1K
- Assembling and connecting in position, fixtures, drains and appliances.
- Leak testing piping and testing fixture for proper operation.
Welding, Brazing and Soldering
3
500
Welding, Brazing and Soldering
3
500
- Proper techniques and safety training on oxyacetylene torches for both brazing and flame cutting of steel.
- Proper safety and operation techniques for airacetylene soldering torches.
- Proper safety and operation of electric discharge welding equipment and electric soldering equipment.
Plumbing Service
1
250
Plumbing Service
1
250
- Maintenance, repair and replacement on water lines, sewer lines, valves, sinks, spigots, boilers, pumps, fittings, water heaters, radiators, toilets and other plumbing fixtures and pipe systems.
Specifications and Codes
2
650
Specifications and Codes
2
650
- Code compliance and understanding code interpretation as it applies to drawings and the design intent.
- Reading architectural blueprints and application of written specifications to the plumbing project.
Job Layout
2
1.1K
Job Layout
2
1.1K
- Proper positioning of all fixtures, appliances and radiators.
- Proper position and path of vent lines and location on the house.
Safety
1
300
Safety
1
300
- All apprentices shall receive OSHA Construction industry Safety Training both in the field and in the class room.
Related Instruction Content
Training Provider(s):
660
RI hours
Basic Safety
15
Basic Safety
15
Basic Math
15
Basic Math
15
Introduction to Hand Tools
10
Introduction to Hand Tools
10
Introduction Power Tools
5
Introduction Power Tools
5
Introduction to Blueprints
8
Introduction to Blueprints
8
Basic Rigging
20
Basic Rigging
20
The Plumbing Trade
3
The Plumbing Trade
3
Basic Plumbing Tools
8
Basic Plumbing Tools
8
Math for Plumbers
5
Math for Plumbers
5
Introduction to Plumbing Blueprint Reading
10
Introduction to Plumbing Blueprint Reading
10
Reading Residential Plumbing Drawings
15
Reading Residential Plumbing Drawings
15
Copper and Plastic Piping Practices
5
Copper and Plastic Piping Practices
5
Soldering and Brazing
8
Soldering and Brazing
8
Cutting and Threading Carbon Steel Pipe
8
Cutting and Threading Carbon Steel Pipe
8
Joining Cast-Iron Pipe and Fittings
15
Joining Cast-Iron Pipe and Fittings
15
Making Flared and Compression Joints with Copper Tubing
5
Making Flared and Compression Joints with Copper Tubing
5
Installing Traps and Interceptors
10
Installing Traps and Interceptors
10
Fitting and Cleanout Requirements for DWV Piping
15
Fitting and Cleanout Requirements for DWV Piping
15
Installing Natural Gas Piping
5
Installing Natural Gas Piping
5
Installing LPG Piping
3
Installing LPG Piping
3
Installing Fuel Oil Piping Systems
3
Installing Fuel Oil Piping Systems
3
Reading Commercial Drawings Part One
20
Reading Commercial Drawings Part One
20
Intermediate Math for Plumbers
15
Intermediate Math for Plumbers
15
Installing Pipe in Trenches
5
Installing Pipe in Trenches
5
Grade for Drain and Waste Piping
10
Grade for Drain and Waste Piping
10
Joining Clay and Concrete Pipe
3
Joining Clay and Concrete Pipe
3
Connecting to the Sewer Main
5
Connecting to the Sewer Main
5
Installing Roof and Floor Area Drains
14
Installing Roof and Floor Area Drains
14
Installing Pipe Hangers and Supports
5
Installing Pipe Hangers and Supports
5
Installing DMV Piping Systems
10
Installing DMV Piping Systems
10
Testing DMV Piping Systems
8
Testing DMV Piping Systems
8
Connecting to the Water Main
5
Connecting to the Water Main
5
Testing Water Supply Piping
5
Testing Water Supply Piping
5
Types of Faucets
8
Types of Faucets
8
Types of Valves
5
Types of Valves
5
Installing and Servicing Valves and Faucets
15
Installing and Servicing Valves and Faucets
15
Installing Water Heaters
5
Installing Water Heaters
5
Water Meters
3
Water Meters
3
Types of Fixtures
10
Types of Fixtures
10
Setting Fixtures
15
Setting Fixtures
15
Reading Commercial Plumbing Drawings Part Two
30
Reading Commercial Plumbing Drawings Part Two
30
Introduction to Regional and Local Plumbing Code
5
Introduction to Regional and Local Plumbing Code
5
Advanced Math for Plumbers
20
Advanced Math for Plumbers
20
Types of Vents and Venting Installations
15
Types of Vents and Venting Installations
15
and Special Waste
5
and Special Waste
5
Sewage Pumps and Sewage Pumping
10
Sewage Pumps and Sewage Pumping
10
Locating Buried Sewer and Water Lines
5
Locating Buried Sewer and Water Lines
5
Installing Pressure Reading Valves
3
Installing Pressure Reading Valves
3
Water Pressure Booster Systems
8
Water Pressure Booster Systems
8
Installing Shock Arrestor
5
Installing Shock Arrestor
5
Backflow Preventers
8
Backflow Preventers
8
Installing Re-circulation Systems
5
Installing Re-circulation Systems
5
Filtering and Softening Water
5
Filtering and Softening Water
5
Cleaning and Disinfecting Potable Water Systems
5
Cleaning and Disinfecting Potable Water Systems
5
Thawing Frozen Water Pipes
3
Thawing Frozen Water Pipes
3
Installing Water Supply Piping
8
Installing Water Supply Piping
8
Fixture Rough-ln
5
Fixture Rough-ln
5
Plumbing for Solar Heating Systems
5
Plumbing for Solar Heating Systems
5
Sizing, Piping and Venting Natural Gas Systems
5
Sizing, Piping and Venting Natural Gas Systems
5
Plumbing Theory
15
Plumbing Theory
15
On the Job Task Organization
8
On the Job Task Organization
8
Sizing Storm Drainage
5
Sizing Storm Drainage
5
Sizing Vents
10
Sizing Vents
10
Sizing Drainage Systems
10
Sizing Drainage Systems
10
Waste and Vent Systems
8
Waste and Vent Systems
8
Servicing Traps and Interceptors
5
Servicing Traps and Interceptors
5
Sizing Water Supply Piping
10
Sizing Water Supply Piping
10
Servicing Plumbing Fixtures
15
Servicing Plumbing Fixtures
15
Installing Swimming Pools and Hot Tubs
5
Installing Swimming Pools and Hot Tubs
5
Installing Compressed Air Piping Systems
8
Installing Compressed Air Piping Systems
8
Installing Hydronic Heating Systems
8
Installing Hydronic Heating Systems
8
Installing Corrosive Resistant Waste Piping
5
Installing Corrosive Resistant Waste Piping
5
Installing Medical Gas Systems
10
Installing Medical Gas Systems
10
Plumbing for Mobile Homes and Mobile Home Parks
8
Plumbing for Mobile Homes and Mobile Home Parks
8
Installing Private Waste Disposal Systems
10
Installing Private Waste Disposal Systems
10
Installing Private Water Supply Systems
10
Installing Private Water Supply Systems
10